 |
Untitled Document
 |
| |
• Initial consultation
• Survey of office or Factory
• Study of the Destination Floor Plan
• Study of Goods Lifts at both sites
• Preparation of Action Plan
• Submission of Quote
• Supply of all necessary lifting & moving equipment
• Supply of all necessary Vehicles
• Supply of trained labor
• Placing of all items at designated positions per the color code system
• Removal of debris
• Arranging of Data, Voice & Power cabling (if required) |
|
|
|
|
|
|
|
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |